DART+ (DART Expansion)

14243454748354

Comments

  • Closed Accounts Posts: 1,844 ✭✭✭Banjoxed


    Victor is a committee member of Railusersireland, who have long campaigned for the interconnector to be built through St. Stephen's Green. One, in particular, of the officers of that group, has spent hours on end posting often and at length here about how the interconnector would go through St. Stephen's Green, and would thus connect with the LUAS.

    The poster Murphaph, who you can see thanking Victor and who is or was a member of RailusersIreland, is on record on this board as saying that the interconnector should be built through St. Stephen's Green because it would be much better for the clients of Copper Face Jack's if they were near to the line, cos' a line at College Green would be miles away.

    Is there a conflict of interest here?

    This is crap. Rail users Ireland is just that. A group made of wait for it, Rail users. You however want to get a big box of crayons out like every wannabe transport scheme vandal over the last forty years.


  • Registered Users Posts: 1,512 ✭✭✭strassenwo!f


    Banjoxed wrote: »
    This is crap. Rail users Ireland is just that. A group made of wait for it, Rail users. You however want to get a big box of crayons out like every wannabe transport scheme vandal over the last forty years.

    That's really not so. I believe that it will be a long time before these projects are built, so in the interim it is sensible to look at how they might be improved.

    By the way, I wish to make it clear that I believe Victor to be the most honorable of men.


  • Registered Users, Registered Users 2 Posts: 19,028 ✭✭✭✭murphaph


    The poster Murphaph, who you can see thanking Victor and who is or was a member of RailusersIreland, is on record on this board as saying that the interconnector should be built through St. Stephen's Green because it would be much better for the clients of Copper Face Jack's if they were near to the line, cos' a line at College Green would be miles away.

    Is there a conflict of interest here?
    FFS. Do you know what a conflict of interests even is? I stand to neither lose nor gain, regardless of if/when/where the interconnector is built. I can just see the common bloody sense behind utilising a rare bit of green space to construct a large interchange station. You can't, that's fine, but don't dare call my ethics into question please.


  • Closed Accounts Posts: 9,193 ✭✭✭[Jackass]


    Relax lads, it's grand. They're going to set up a couple of new bus routes for 650 million. But don't worry, they have platforms.

    http://www.irishtimes.com/news/environment/rapid-bus-scheme-for-dublin-could-cut-journey-times-by-40-1.1676911


  • Registered Users Posts: 4,746 ✭✭✭irishmover


    [Jackass] wrote: »
    Relax lads, it's grand. They're going to set up a couple of new bus routes for 650 million. But don't worry, they have platforms.

    http://www.irishtimes.com/news/environment/rapid-bus-scheme-for-dublin-could-cut-journey-times-by-40-1.1676911

    Live in Brisbane and they have this. Underground stations in the city aswell. Cuts out a lot of traffic. So not sure if you're serious in your post or ridiculing the idea but it's a very good idea so you should hope it happens to be honest.


  • Advertisement
  • Closed Accounts Posts: 1,492 ✭✭✭KCAccidental


    the busway in Brisbane is a mile away from what is being proposed here!


  • Closed Accounts Posts: 879 ✭✭✭TheBandicoot


    Doesn't really have anything to do with DU. BRT is important as another high quality route, but ultimately DU will have to be built to tie all the routes as a backbone and open up more journey possibilities.


  • Moderators, Motoring & Transport Moderators Posts: 14,083 Mod ✭✭✭✭monument




  • Registered Users Posts: 4,746 ✭✭✭irishmover


    the busway in Brisbane is a mile away from what is being proposed here!

    In size yes. In method no.

    It will cut a decent amount of traffic out.

    Who wouldn't want a much faster and direct bus route to each of these places?


    Does this not look familiar? It's a BRT But the one in Brisbane has come ok a long way since initial construction. Whose to say the same can't happen in Dublin. So a mile away? Not a chance.

    Edit: Just seen a thread on this already. Will drop the discussion here :)


  • Registered Users, Registered Users 2 Posts: 4,905 ✭✭✭Aard


    The proposed BRT and Dart Underground have almost no overlap, so could all BRT-related discussion please be held here: http://www.boards.ie/vbulletin/showthread.php?t=2057010435

    Mod.


  • Advertisement
  • Registered Users Posts: 1,512 ✭✭✭strassenwo!f


    The interconnector is a great idea. A line right through the citty centre.

    The city now needs to work on how it can be as effective as posible. Obviously the route to/from Tallaght/Clondalkin has been squandered by bad planning, which is a pity, as it would have connected the two biggest urban areas in the county.

    But there are other possibilites, north of the Hazelhatch line, which could still make this a very viable route.


  • Closed Accounts Posts: 879 ✭✭✭TheBandicoot


    Metro West is the real option, not the spurs off the Heuston line that you have described as wanting. It will interchange with the DART network at two locations and thus feed the tunnel.


  • Registered Users Posts: 1,512 ✭✭✭strassenwo!f


    Metro West is the real option, not the spurs off the Heuston line that you have described as wanting. It will interchange with the DART network at two locations and thus feed the tunnel.

    Can you not see the sense in utilising the enormous capacity of the tunnel to provide a direct service between several West Dublin suburbs and the city? One of the main cities which Dublin looked at was Porto, and they have spurs off the main line to provide such direct services. Several other cities do this - Munich, Frankfurt, London, etc. This metrowest idea of bringing people around a city before you've dealt with the issue of getting them into it is very much a minority sport.

    In Frankfurt, for example, you get on an S-Bahn and you're going into (or out of) the city. If you want to go somewhere else, you have to change. And that's what suits most people. In Dublin, with the metrowest, they've got it back to front: if you get on a metrowest tram you're going around the city, and if you want to get into the city then you have to change.

    It costs a bit more money to do it the way most other cities have done it. But if the Dublin way was the right way then a whole heap of other cities would have something akin to the metrowest. And the majority don't.


  • Registered Users, Registered Users 2 Posts: 7,685 ✭✭✭GerardKeating



    It costs a bit more money to do it the way most other cities have done it. But if the Dublin way was the right way then a whole heap of other cities would have something akin to the metrowest. And the majority don't.

    The Metro West (and Metro North) Route should be Full DART, from Tallaght to the Airport, with suitable connections to allow through running from the line into town via either Kildare or Maynooth Lines.

    You could even allow Sligo trains to run from Hueston if one wanted.


  • Registered Users, Registered Users 2 Posts: 1,419 ✭✭✭Cool Mo D


    I think Strassenwolf is right about DART spurs being a better idea than metro west. Firstly, DART spurs would be more likely to take people where they want to go: the city centre, while still linking west Dublin, even if it is indirectly.
    Secondaly, after DART underground there'd be a 4-track railway leading into a high-capacity DART tunnel with lots of capacity to be filled - a perfect situation for adding spurs.

    There is definitely space for some simple spurs - to Celbridge, Naas, and Clondalkin village. And if you cut and cover under parkland, you could serve places like Lucan (via Griffeen Valley park).


  • Registered Users, Registered Users 2 Posts: 19,028 ✭✭✭✭murphaph


    I'd support the idea of Naas being reconnected but not the others.


  • Registered Users, Registered Users 2 Posts: 69,249 ✭✭✭✭L1011


    Celbridge should have its planning completely and utterly restricted to forbid even one more one-off house, estate, office or retail development to be built in the direction of Maynooth or Clane until it has actually reached its existing train station - and that should have happened when they first planned re-opening it at that.


  • Registered Users Posts: 1,512 ✭✭✭strassenwo!f


    murphaph wrote: »
    I'd support the idea of Naas being reconnected but not the others.

    Let's connect a town in County Kildare directly to the interconnector, and maybe build up higher density along the route to support it; Let's not attempt to do the same thing in County Dublin.


  • Registered Users, Registered Users 2 Posts: 19,028 ✭✭✭✭murphaph


    Let's connect a town in County Kildare directly to the interconnector, and maybe build up higher density along the route to support it; Let's not attempt to do the same thing in County Dublin.
    You are making assumptions now.

    I support the Metro West concept of feeding the interconnector inside the Dublin county boundary. I get to work by taking an orbital train and then changing to a radial one. It works! There's more than one way to skin a cat!


  • Moderators, Category Moderators, Computer Games Moderators, Society & Culture Moderators Posts: 8,517 CMod ✭✭✭✭Sierra Oscar


    I remember reading that some of the enabling works for the DART Underground will be carried out during the construction of Luas Cross City, but I can't find any information on this now.

    Anyone have further information, is this actually occurring?


  • Advertisement
  • Registered Users Posts: 1,512 ✭✭✭strassenwo!f


    murphaph wrote: »
    You are making assumptions now.

    I'm afraid I can only work with what you say on the board, and you said above that you'd support a new, direct link between a town (Naas) in County Kildare and the city centre, but would be against any new, direct links between suburbs in West Dublin and the city centre. What assumptions am I making?
    murphaph wrote: »
    I support the Metro West concept of feeding the interconnector inside the Dublin county boundary. I get to work by taking an orbital train and then changing to a radial one. It works! There's more than one way to skin a cat!

    Berlin is hardly a good model for what Dublin needs to do. Firstly, the properly built-up area of the city is much greater in population and area than Dublin. Secondly, it spent several decades developing two separate rail networks which, in reality, are still being incorporated into each other. The orbital rail line in Berlin makes a lot of sense as part of this incorporation process.

    We all know that it is possible to do what you do on your way to and from work, i.e. travel on an orbital route and then a radial route to the centre. But cities which are smaller than Berlin and do not have its unique public transport history, like Porto or Frankfurt, with spurs from a main line to serve several routes and connect several suburbs directly with the city centre, surely represent more what Dublin needs to be doing at this stage.


  • Registered Users Posts: 1,512 ✭✭✭strassenwo!f


    And, from what I have seen of Berlin's orbital route it is largely elevated, and is a train, rather than operating a lot like a tram. No road crossings, that I remember.

    From what we've had on this thread of, for example, metrowest trams "threading" their way through the streets of Clondalkin, on their way to and from Tallaght, we may be talking about different levels of service.

    Are we comparing like with like, on a person's journey to or from work?


  • Registered Users, Registered Users 2 Posts: 19,028 ✭✭✭✭murphaph


    I'm not getting drawn into an endless debate. Naas used to be directly connected by the way. I think metro west is a good choice for Dublin and a good way to feed from tallaght and clondalkin into the interconnector. Metro west will have high levels of segregation along the lines of the red line as far in as James's. That's perfectly adequate and if it's massively successful they can upgrade it gradually and add grade separation as required.

    Your option requires full grade separation from day one. Different approach. More expensive probably.


  • Registered Users Posts: 1,512 ✭✭✭strassenwo!f


    murphaph wrote: »
    I'm not getting drawn into an endless debate. Naas used to be directly connected by the way. I think metro west is a good choice for Dublin and a good way to feed from tallaght and clondalkin into the interconnector. Metro west will have high levels of segregation along the lines of the red line as far in as James's. That's perfectly adequate and if it's massively successful they can upgrade it gradually and add grade separation as required.

    Your option requires full grade separation from day one. Different approach. More expensive probably.

    Ditto, I'm not interested in an endless debate about a project which has got be many years away from happening. I just do want to make a couple of points,

    There is a lot of capacity in the proposed interconnector. Unfortunately, it appears that it would be difficult, for a number of reasons, to use some of this to serve the Clondalkin-Tallaght bit With other areas of West Dublin there may not be such barriers.

    Building the metrowest, as it is currently proposed, most probably means building pretty much most of it - at least if it is to have serious usefulness as an orbital route.

    Upgrading it to eventually take account of the fact that the dominant demand in West Dublin is to get into the city, rather than around the city, then requires longer stations, building new bridges over junctions, and probably most importantly a gauge change. This would be colossal interference on a line which is being upgraded because it's successful.

    It would be much better, in my opinion, to build the huge-capacity interconnector with a coherent plan to build spurs, and gradually providing a better service for various western suburbs via extensions.


  • Registered Users, Registered Users 2 Posts: 4,905 ✭✭✭Aard


    Infrastructural capactiy is not the same as operational capacity. Increasing the number of trains to the maximum infrastructural capacity of the interconnector may increase pax but it also hugely increases operational costs. The literature on network configuration generally advises against the multiple-branch model (i.e. spurs to Tallaght and Clondalkin) and in favour of the network model (i.e. Interconnector + MW). The network (or mesh/grid) model generally leads to greater take-up of public transport over branches.


  • Closed Accounts Posts: 299 ✭✭Copyerselveson



    Upgrading it to eventually take account of the fact that the dominant demand in West Dublin is to get into the city, rather than around the city, then requires longer stations, building new bridges over junctions, and probably most importantly a gauge change. This would be colossal interference on a line which is being upgraded because it's successful.

    It would be much better, in my opinion, to build the huge-capacity interconnector with a coherent plan to build spurs, and gradually providing a better service for various western suburbs via extensions.

    I'm inclined to agree regarding the spurs, indeed I would build a spur from the GSWR mainline through Celbridge and onto Leixlip to not only provide a direct rail link into Celbridge itself but to also re-route Sligo mainline trains into Heuston and the Interconnector rather than Connolly.

    But why change the gauge? There is unlikely to be any direct trains between Ireland, GB and the continent until we will be wearing tinfoil suits and whizzing around in flying cars like the Jetsons used to.


  • Registered Users, Registered Users 2 Posts: 7,685 ✭✭✭GerardKeating


    I'm inclined to agree regarding the spurs, indeed I would build a spur from the GSWR mainline through Celbridge and onto Leixlip to not only provide a direct rail link into Celbridge itself but to also re-route Sligo mainline trains into Heuston and the Interconnector rather than Connolly.

    But why change the gauge? There is unlikely to be any direct trains between Ireland, GB and the continent until we will be wearing tinfoil suits and whizzing around in flying cars like the Jetsons used to.

    Only reason for a reGauge would be to link to Metro North maybe.

    I would like to see Metro North/South Built to a full DART standard (when we win the Lotto) to run from the Northern Line at/near Rush to Tallaght, and maybe the interconnector branch off this rather than bother with Spenser Dock, if someone will give me the crayons for a year or so.

    And we would have the spur from the Kildare line, to go from the end of Metro South, to the Maynooth Line via Liffey Valley Centre and the Blanchardstown SC, and on to the various Ind Estate /Business park there.


  • Registered Users Posts: 1,512 ✭✭✭strassenwo!f


    Aard wrote: »
    Infrastructural capactiy is not the same as operational capacity. Increasing the number of trains to the maximum infrastructural capacity of the interconnector may increase pax but it also hugely increases operational costs. The literature on network configuration generally advises against the multiple-branch model (i.e. spurs to Tallaght and Clondalkin) and in favour of the network model (i.e. Interconnector + MW). The network (or mesh/grid) model generally leads to greater take-up of public transport over branches.

    You probably don't want or need to go to the extent of a city like Munich when it comes to branching, though that city does have one of Europe's most effective underground networks and manages to cover a whole urban area with just four lines. But there are many cities with branched lines and generally those lines work well. Dublin is not a megalopolis.


  • Banned (with Prison Access) Posts: 6,995 ✭✭✭Schadenfreudia


    I remember reading that some of the enabling works for the DART Underground will be carried out during the construction of Luas Cross City, but I can't find any information on this now.

    Anyone have further information, is this actually occurring?

    There is an "box" being constructed somewhere under the Rotunda Hospital.


  • Advertisement
  • Registered Users, Registered Users 2 Posts: 4,905 ✭✭✭Aard


    You probably don't want or need to go to the extent of a city like Munich when it comes to branching, though that city does have one of Europe's most effective underground networks and manages to cover a whole urban area with just four lines. But there are many cities with branched lines and generally those lines work well. Dublin is not a megalopolis.

    You're confusing several debates. There's infrastructure design, infrastructure capacity, operational capacity, projected passenger numbers, projected development, network design, and of course the fact that MW is more than just a feeder service to DU and the city centre.

    "Dublin is not a megalopolis" is not an argument imo. It's not as simple as saying there's one way of doing things for large cities and another way for small cities.