Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie

New Draft Development Plan 2011-2017

Options

Comments

  • Registered Users Posts: 81,220 ✭✭✭✭biko


    Can you clarify what the issue is?


  • Registered Users Posts: 2,005 ✭✭✭jkforde


    Magnus wrote: »
    Can you clarify what the issue is?

    No specific issue as such, just bringing to the attention of the forum that the new draft city plan is out to public consultation and that we should engage with it and send in tonnes of ideas and constructive support. :eek:

    🌦️ 6.7kwp, 45°, SSW, mid-Galway 🌦️



  • Banned (with Prison Access) Posts: 25,234 ✭✭✭✭Sponge Bob


    jkforde wrote: »
    we should engage with it and send in tonnes of ideas and constructive support. :eek:

    Dopey planners have no plan to expand the MAN or to MANDATE developers to provide carrier neutral ducting into premises ( business or residential) in order to provide for FTTH or indeed any future broadband requirements.

    Even MONAGHAN includes this in its county development plan. You may email your comments to planning@galwaycity.ie

    http://www.monaghan.ie/websitev2/download/pdf/planning/developmentplan2007-2013/FinalPrintedVersion/Chp%208%20Dev%20Manage%20Guidelines.pdf
    All new housing developments shall require the following
    ducting for future provision of broadband and services:
    2 No. 110mm diameter Upvc pipes from the entrance of the
    Estate along the main reservation of the Estate access roads.

    These ducts are to be chambered at the start point, finish
    point, at every change in direction and at intervals no
    greater than 250 metres.The chamber size is to be 1,200mm
    x 600mm. Where possible, the duct network should be
    designed as resilient which may require the laying of ducts
    at either side of the road.

    A single duct branch connection is to be extended off the
    spine duct network described above to each individual
    dwelling.
    A 600 x 600mm chamber shall be installed along
    this duct at each group of four houses. From this chamber 1
    28mm sub-duct shall extend into each dwelling to a point
    near the consumer unit. The length of sub-duct is not to
    exceed 100 metres. (Draw ropes to be included).

    The design of the network described above is to be presented
    to the Local Authority for approval prior to commencement
    of work onsite.


  • Closed Accounts Posts: 199 ✭✭unJustMary


    What's the MAN?


  • Posts: 17,378 ✭✭✭✭ [Deleted User]


    Hey! I'm from Monaghan :(


  • Advertisement
  • Registered Users Posts: 2,005 ✭✭✭jkforde


    unJustMary wrote: »
    What's the MAN?

    Metropolitan Area Network - cable or optic fibre bandwidth in urban areas

    will be emailing to push them for best standard and that god-awful civil service phrase 'future-proof'.

    🌦️ 6.7kwp, 45°, SSW, mid-Galway 🌦️



Advertisement