S2S Cycleway - northside

Options
1404143454656

Comments

  • Registered Users Posts: 3,113 ✭✭✭mr spuckler


    Leroy42 wrote: »
    How will that help? The issue isn't speed, its sight lines and expectations.

    If a car is turning right from town across the traffic they are looking for traffic not cyclists coming from either direction.

    It is safer for all concerned to take note of the dangers and be cautious. It's a yield, not a stop, so cyclists need to take care.

    It would help in the same way it helps and works in other jurisdictions. There's little issue with sight lines here if people are looking, my only conflicts with motorists here have been when they simply didn't look for me. Creating clearly visible distinction between the cycle track and roadway, including signage, also addresses the expectation issue for motorists.


  • Registered Users Posts: 2,287 ✭✭✭Ferris


    With the current crap layout there was no alternative but those damn yield signs.

    But the whole solution is sub optimal. Also, clearly there was a process gone through as it doesn't take even DCC 18 months to paint some yield signs on the road. Clearly they couldn't come to a solution so took this half arsed approach instead.

    Note that in the planning drawings for the baths there is a fully designed carpark included - even so the entrance/exit was still poorly designed. However this has clearly fallen by the wayside - probably due to cost. DCC has clearly dropped the ball here. By failing to require that the developer adequately maintain a state asset, the public are left with a reduced quality cycleway.


  • Registered Users Posts: 2,287 ✭✭✭Ferris




  • Registered Users Posts: 3,113 ✭✭✭mr spuckler


    Ferris wrote: »
    With the current crap layout there was no alternative but those damn yield signs.

    there's also the option of actual enforcement, even to sort out the parking layout. Donna Cooney has been chasing on this and says there's an open enforcement file at the council but nothing has happened so far. it seems the council previously tried to push back on a structure that was built outside of planning permission on this site but then gave up and granted retention. when that's what we're dealing with we can expect little change...


  • Registered Users Posts: 2,287 ✭✭✭Ferris


    there's also the option of actual enforcement, even to sort out the parking layout. Donna Cooney has been chasing on this and says there's an open enforcement file at the council but nothing has happened so far. it seems the council previously tried to push back on a structure that was built outside of planning permission on this site but then gave up and granted retention. when that's what we're dealing with we can expect little change...

    I've replied to Ciaran Cuffe and copied Donna Cooney, they've been responsive before. I share your frustration, seems that councils are still backing developers over the public interest, its a poor show.


  • Advertisement
  • Registered Users Posts: 6,440 ✭✭✭cdaly_


    If people started to use it as a park-and-pedal facility, 7-days it would end up filled by cyclist-aware drivers who would take proper care crossing the cycle track. That might help make things safer...


  • Registered Users Posts: 697 ✭✭✭Cionn


    I still would love to see the safety /risk assessment documentation. It's basically safer for the driver at the expense of the cyclists


  • Registered Users Posts: 3,113 ✭✭✭mr spuckler


    cdaly_ wrote: »
    If people started to use it as a park-and-pedal facility, 7-days it would end up filled by cyclist-aware drivers who would take proper care crossing the cycle track. That might help make things safer...

    Some do - I often see bike racks on the back of cars parked there. Only free parking in the area!


  • Registered Users Posts: 890 ✭✭✭brocbrocach


    They have redrawn lines all around the area though. It could just be a part of that rather than a conscious redrawing of the junction.


  • Registered Users Posts: 3,113 ✭✭✭mr spuckler


    They have redrawn lines all around the area though. It could just be a part of that rather than a conscious redrawing of the junction.

    those yield markers weren't there before so these aren't redrawn. some of the other markings have been refreshed which is welcome.


  • Advertisement
  • Registered Users Posts: 2,859 ✭✭✭Duckjob


    The same general idea yes, though with clear signage to indicate priority for cyclists.
    Another example below if it comes through, showing a distinct change in colour for the track. You keep the cyclists at the same level and force a change in level for the motorists to cross.

    Mitchams4Table.jpg


    As per the normal situation in Ireland, it's not really a technical/design problem that needs to be solved because the proven designs are there in other countries for all to see. It's a cultural and a political problem.

    Cultural because our planners, like everyone else,have been in immersed in decades of the car culture Matrix.

    Political because, even if they manage to unplug from the Matrix to realise the above, the idea of doing anything that disturbs the status quo, and especially something that disturbs the status quo in favour of cyclists, is a politically terrifying prospect for them.

    I've said many times before that its only as long as we continue to pander to the most bulky, most inefficient, most noisy, most pollution form of personal transport, that other most sustainable forms of transport need to compete with each other for the scraps of space left over.

    The Dutch grasped this nettle decades ago, when they started actively taking space from cars, and giving it to other more sustainable forms.

    How long I wonder before our elected representatives actually grow the balls to grasp that nettle here.


  • Registered Users Posts: 13,767 ✭✭✭✭mrcheez


    Duckjob wrote: »
    How long I wonder before our elected representatives actually grow the balls to grasp that nettle here.

    I think they'd prefer to grasp the former over the latter


  • Registered Users Posts: 1,294 ✭✭✭Pigeon Reaper


    It's a really half arsed way of doing things. When PP was sought this was pointed out as an issue and the council insisted that it wouldn't cause problems.


  • Registered Users Posts: 14,317 ✭✭✭✭Raam


    I've no problem with the yield signs. From both directions you are entering a pedestrian area briefly. There is a footpath at both sides.


  • Registered Users Posts: 6,485 ✭✭✭Fighting Tao


    Doesn’t there have to be a yield sign to make it official?


  • Registered Users Posts: 2,287 ✭✭✭Ferris


    No problem yielding to Pedestrians, they're slow and don't weigh 2 tons and to be fair the practice of yielding to them is consistent along the Cycleway. Apart from the traffic lights at the wooden bridge this is the only junction on the cycleway where bikes yield to cars now. Cars yield to bikes at the car parks at the Bus garage.

    Its the principle I'm afraid.


  • Moderators, Category Moderators, Arts Moderators, Sports Moderators Posts: 49,572 CMod ✭✭✭✭magicbastarder


    Raam wrote: »
    I've no problem with the yield signs. From both directions you are entering a pedestrian area briefly. There is a footpath at both sides.
    yeah, it's not a hill for cyclists to die on.

    i see there's a cycle lane protection on today prompted by the spice girls concert resulting in the stretch on alfie byrne road being used for coach parking. it's not an issue i'm particularly fussed about. partly because i never use the cycle lane myself on that stretch.


  • Registered Users Posts: 377 ✭✭ChrisJ84


    yeah, it's not a hill for cyclists to die on.

    This is my take on it as well. From a purely pragmatic perspective, that stretch by the baths is somewhere I always slow down and am extra vigilant. Regardless of the road set up, there is still a fair chance of a car swinging in without looking / seeing cyclists.

    Not saying we should excuse poor infrastructure, I just think that is always going to be a potentially dodgy spot.


  • Registered Users Posts: 6,485 ✭✭✭Fighting Tao


    The IBike action to protect the cycle track from bus parking has changed start time. It’s now 4pm today.

    I’m not affiliated to them but agree with this action.


  • Registered Users Posts: 9,760 ✭✭✭Effects


    i see there's a cycle lane protection on today prompted by the spice girls concert resulting in the stretch on alfie byrne road being used for coach parking.

    As far as I know, there's other designated coach parking but they just prefer to park up on this cycle path.


  • Advertisement
  • Registered Users Posts: 9,760 ✭✭✭Effects


    Probably be a more regular occurrence from now on with the better weather.

    lGBo6Sv.jpg

    R1e22TB.jpg


  • Registered Users Posts: 6,485 ✭✭✭Fighting Tao


    Effects wrote: »
    As far as I know, there's other designated coach parking but they just prefer to park up on this cycle path.

    The Gardaí have it on their website that the cycle lane is closed to allow for bus parking. There is a large and under-used NTA bus park at Spencer Dock. Not that far away.

    There doesn’t appear to have been a proper traffic management plan published in advance providing notice of the cycle track closure. I believe there is a legal requirement for notice in the papers. I am open to correction though.


  • Registered Users Posts: 9,760 ✭✭✭Effects


    There is a large and under-used NTA bus park at Spencer Dock. Not that far away.
    Yeah, that's the one I'm thinking of.

    I'm heading along to the protest this evening as it's near where I live.

    Gardai don't seem to care that much for bad parking in the general area.
    People routinely park on the footpath along Fairview, leaving just the cycle path for both bikes and pedestrians. Gardai do nothing about it.


  • Registered Users Posts: 14,317 ✭✭✭✭Raam


    Work happening now at the baths. At least one post was removed, to be replaced with....? Kissing gates :D Seriously though, I didn't hang around to find out. Probably the smaller ones likes at the bus depot.


  • Registered Users Posts: 968 ✭✭✭railer201


    More concrete bollards have been removed at the entrance to Clontarf Baths, so cars can sweep into the carpark at speed if they wish. Prior to this the bollards did restrict the width of the entrance and vehicles had to slow right down.

    As of this morning, there are no poles and no signs at all, save the white triangles on the cycle track surface marking the end of the cycle lanes.

    In comparison to the entrances at the Yacht Club/Bus Garage where STOP signs are in place for vehicles entering/exiting the carparks, the situation at the Baths carpark is currently potentially dangerous for cyclists.

    Beware :(


  • Registered Users Posts: 221 ✭✭BrianHenryIE


    From Facebook S2S page: https://www.facebook.com/120315358050159/posts/2201264499955224
    S2S should be on the Seafront- Not the Merrion Rd. Make your views known to the NTA before the May 31st deadline.
    The preliminary plans for the Bus Connects puts part of the S2S on the Merrion Road instead of on the seafront where it can be constructed with the Coastal Protection of the Railway which is also being planned. For more information check the S2S website here: http://s2s.ie/support-needed-now-may-2019/


  • Registered Users Posts: 14,317 ✭✭✭✭Raam


    More works happening at the baths this morning.


  • Moderators, Category Moderators, Arts Moderators, Sports Moderators Posts: 49,572 CMod ✭✭✭✭magicbastarder




  • Registered Users Posts: 14,317 ✭✭✭✭Raam


    Well then.


  • Advertisement
  • Registered Users Posts: 3,113 ✭✭✭mr spuckler


    There was a lady on the town side of the wooden bridge this morning doing a behaviours & attitudes survey regarding the cycle track. Am pretty sure she said it was on behalf of the NTA.

    She was asking questions regarding satisfaction with the width, junctions, speed, segregation, safety etc of the track, both at that point (which is wide and well surfaced) as well as along the entire length. Coincidentally I highlighted the baths and junction design in general as discussed here recently as my primary concerns.

    Will be interesting to see what if anything comes out of it.

    Oh and she gave me 2 emergency backup lights...