    Hi, I am looking for an estimate on a refurb.
    700sq foot home. Two up two down in dub.
    We need gas central heating connected and installed.
    Full rewire of electrics.
    Internal insulation fitted and ready to paint.
    That's all for the minute.

    Any ideas roughly.


Comments

  • Moderators, Society & Culture Moderators Posts: 39,458 Mod ✭✭✭✭Gumbo


    righteo wrote: »
    Hi, I am looking for an estimate on a refurb.
    700sq foot home. Two up two down in dub.
    We need gas central heating connected and installed.
    Full rewire of electrics.
    Internal insulation fitted and ready to paint.
    That's all for the minute.

    Any ideas roughly.

    15k (very rough beer mat calc)


  • Moderators, Home & Garden Moderators, Science, Health & Environment Moderators Posts: 17,992 Mod ✭✭✭✭DOCARCH


    righteo wrote: »
    ...in dub...
    kceire wrote: »
    15k (very rough beer mat calc)

    I would double that, at least! I'd suggest need to budget E30K.


  • Registered Users Posts: 6 righteo


    kceire wrote: »
    15k (very rough beer mat calc)

    Thanks, for the reply


  • Registered Users Posts: 6 righteo


    DOCARCH wrote: »
    I would double that, at least! I'd suggest need to budget E30K.

    Thanks for the reply


  • Moderators, Society & Culture Moderators Posts: 39,458 Mod ✭✭✭✭Gumbo


    DOCARCH wrote: »
    I would double that, at least! I'd suggest need to budget E30K.

    15k on each side of the beer mat I meant :P


    Seems I was way off price wise. I completely overlooked the internal insulation to be fitted and skimmed.


  • Advertisement
  • Subscribers Posts: 41,654 ✭✭✭✭sydthebeat


    kceire wrote: »
    15k (very rough beer mat calc)

    could be looking at 20k alone for electrics and plumbing......

    30k min in my opinion


  • Registered Users Posts: 1,174 ✭✭✭kieran.


    35-40K As your redoing a full Elec and Heating its a total rework of all internal surfaces.


  • Registered Users Posts: 1,048 ✭✭✭RoryW


    someone once told me to allow 500 per m2 for refurbishment but i appreciate that this is a rule of thumb and can vary depending on the size of the property as economies of scale can apply

    700 sq ft = 65 m2 x 500 = 32,500

    but like everything the devil is in the detail
    windows
    electrics
    windows
    plumbing
    etc
    etc