Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Some salutary lessons here:Documented examples of existing situations

  • 07-07-2016 9:01pm
    #1
    Registered Users, Registered Users 2 Posts: 12,595 ✭✭✭✭


    From
    http://www.buildup.eu/en/practices/p...rm=Read%20more
    to this
    http://qualicheck-platform.eu/2016/0...e-works-final/

    Report attached:

    Can be scanned quickly easily: no input from Eire, perfect as normal.
    This one caught my eye:
    there are example for PV, Solar Thermal, MHVR etc

    According to these experts, the most common problems related to the quality of the works in domestic heat pump installations in France are:
     Oversizing of the heat pump capacity in the case it has been chosen by the installer (i.e. without detailed study of the heating needs).
     Too low quantity of refrigerant inside the appliance.
     No technical documentation provided to the user about the installation (technical documentation of
    the heat pump, drawings of the hydronic circuit, electrical diagram of the installation).
     No information provided to the user about the commissioning of the installation.
     For air to water heat pumps:
     wrong positioning of the outdoor unit, with insufficient passage for the fresh air and/or recycling of the fresh air flow;
     absence of a drain to evacuate condensates;
     in some cases, no electrical connection of the electrical heating backup electrical resistance;  wrong adjustment of the defrosting cycle times.
     For water to water heat pumps:
     undersizing of the primary circuit water pump or too low primary water flow rate.
     For ground source heat pumps:
     undersizing of the surface of the ground collectors.