Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

Why no trains from Maynooth to Docklands

  • 23-03-2017 2:55pm
    #1
    Banned (with Prison Access) Posts: 1,279 ✭✭✭


    Also none from Sallins to Docklands

    Surely this would create extra space on the system?

    If you have a Sallins train going through Drumcondra to Connolly with a train from Maynooth doing the same five minutes later why not reroute it to Docklands and let passengers change trains at Drumcondra.

    Also

    If you have a train that orginated in Maynooth going through Drumcondra to Connolly with a train from Sallins doing the same five minutes later why not reroute the Maynooth train to Docklands and let passengers change trains at Drumcondra.


Comments

  • Registered Users, Registered Users 2 Posts: 8,295 ✭✭✭n97 mini


    Trains from Docklands run on a line that does not go through Drumcondra.

    Ideally an interchange station would be built further back near Liffey Jcn but the track layout there needs work too.


  • Registered Users, Registered Users 2 Posts: 4,839 ✭✭✭thomasj


    Trains cannot get directly to Docklands station from Drumcondra.

    Sure if they were able, Kildare line services would have been using Docklands by now without the need to solve the Connolly Capacity issue


  • Banned (with Prison Access) Posts: 1,279 ✭✭✭kidneyfan


    thomasj wrote: »
    Trains cannot get directly to Docklands station from Drumcondra.

    Sure if they were able, Kildare line services would have been using Docklands by now without the need to solve the Connolly Capacity issue

    Well that that's answered.


  • Banned (with Prison Access) Posts: 1,279 ✭✭✭kidneyfan


    n97 mini wrote: »
    Trains from Docklands run on a line that does not go through Drumcondra.

    Ideally an interchange station would be built further back near Liffey Jcn but the track layout there needs work too.

    Well that's that answered.


Advertisement