Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie

Dublin - BusConnects

Options
11213151718122

Comments

  • Moderators, Computer Games Moderators, Recreation & Hobbies Moderators Posts: 10,333 Mod ✭✭✭✭CatInABox


    Who is the "Mr. Mitchell" that is quoted in the article? No introduction given to him.

    Yeah, it's bizarre, and bad journalism.

    The proposal is a ridiculously poor use of buses as well, having a buses trundle along a motorway with no ability to stop and pick up passengers, just to connect two tram lines.

    I can understand the desire, but BusConnects is all about getting the most out of our current bus fleet, but buses aren't the way to connect the Luas


  • Registered Users Posts: 896 ✭✭✭Bray Head


    CatInABox wrote: »
    I can understand the desire, but BusConnects is all about getting the most out of our current bus fleet, but buses aren't the way to connect the Luas

    Bus Connects includes the (sensible) proposal to a return to a part single-decker fleet for at least some orbital routes.

    Currently, routes are built around the capacities of the fleet, and not the other way around.

    Heavy double-deckers that chew diesel are not optimal on lightly-patronised, peripheral routes with lots of stops.


  • Registered Users Posts: 3,612 ✭✭✭Dardania


    CatInABox wrote: »
    Who is the "Mr. Mitchell" that is quoted in the article? No introduction given to him.

    Yeah, it's bizarre, and bad journalism.

    The proposal is a ridiculously poor use of buses as well, having a buses trundle along a motorway with no ability to stop and pick up passengers, just to connect two tram lines.

    I can understand the desire, but BusConnects is all about getting the most out of our current bus fleet, but buses aren't the way to connect the Luas
    I thin somewhere in the report, the authors note reluctance to rely on the M50 due to congestion. The use case sounds valid - could be one of those peak routes, if there is ridership to justify it? Not stopping everywhere isn't such a bad idea, or interchanges could be just off the motorways (like the N4/M50 interchange proposed for example)


  • Registered Users Posts: 155 ✭✭Kevtherev1


    Who is the "Mr. Mitchell" that is quoted in the article? No introduction given to him.


    Correct i noticed that myself, no proof reading by the writer. Meeting was organized by Fianna Gael. Maybe mitchell is formed TD and MEP Gay Mitchell but that is just a guess on my part.



    https://en.wikipedia.org/wiki/Gay_Mitchell


    Why is their no new bus route going between Luas Tallaght Red line to Luas green line Dundrum. Tallaght - terenure --dundrum. I suppose new connects plan people have to change at terenure.


  • Registered Users Posts: 1,638 ✭✭✭Qrt


    Kevtherev1 wrote: »
    Another bus connects article. Calls for a bus route to connect the Red and Green Luas Lines with a orbital route between Red Cow- M50-- Carrickmines



    https://www.irishtimes.com/news/ireland/irish-news/bus-connects-plan-missing-orbital-link-between-luas-lines-1.3581340

    If only there were multiple planned...oh wait!


  • Advertisement
  • Registered Users Posts: 1,961 ✭✭✭LionelNashe


    I googled 'Fine Gael North Wicklow Mitchell' and found this councillor:

    https://twitter.com/CllrDMitchell/status/1014539013791932416


  • Registered Users Posts: 486 ✭✭Pixel Eater


    Sorry just coming in on this thread now; what is the NBRU's gripe with the potential new system? Is it just the usual union intransigence or do they have some genuine concerns? I just checked their Twitter feed and it mostly consists of ad hominem attacks on Walker himself and can't really make out what their issue is??


  • Registered Users Posts: 5,606 ✭✭✭schemingbohemia


    Sorry just coming in on this thread now; what is the NBRU's gripe with the potential new system? Is it just the usual union intransigence or do they have some genuine concerns? I just checked their Twitter feed and it mostly consists of ad hominem attacks on Walker himself and can't really make out what their issue is??

    Don't like change, view it as a stalking horse for further privatisation, pretending they care about their customers.

    Think they were opposed to Network Direct as well, but perhaps not as visibly, remember hearing of leaflets on buses.

    They just keep showing their ignorance of the merits of the scheme.

    Referring to it as the Walker scheme is just ignorant.


  • Moderators, Computer Games Moderators, Recreation & Hobbies Moderators Posts: 10,333 Mod ✭✭✭✭CatInABox


    Sorry just coming in on this thread now; what is the NBRU's gripe with the potential new system? Is it just the usual union intransigence or do they have some genuine concerns? I just checked their Twitter feed and it mostly consists of ad hominem attacks on Walker himself and can't really make out what their issue is??

    Even Walker can't get their issue out of them. He's asked them several times, but it seems to come down to the NBRU believing that requiring an interchange is an all out assault on the community, therefore they want to keep the direct routes at all costs.

    Cynical old me, I just think that the NBRU is on a recruitment drive, looking for more money, or are worried about their roster.


  • Registered Users Posts: 9,515 ✭✭✭cgcsb


    it's cannon fodder for an industrial dispute, that is all. Network Direct was a case of axing services to maintain pay and conditions, so of course the NBRU would have nothing to say on the matter.


  • Advertisement
  • Moderators, Computer Games Moderators, Recreation & Hobbies Moderators Posts: 10,333 Mod ✭✭✭✭CatInABox


    The first public meeting with the NTA is going on now, out in Charlestown SC, in Finglas.

    https://twitter.com/BusConnects/status/1025013660941537281

    Seems to be great interest.


  • Registered Users Posts: 4,897 ✭✭✭fly_agaric


    Had been wondering where the opposition is coming from also.
    I had a thought it might be a general fear of "privatisation" as they see it.
    The simplification/efficiency gains make it easier to see which parts of Dublin bus service could be hived off for profit.
    Of course that would have nothing at all to do with this plan, and is all about Irish politics, the ignorance of the general public (& FF/FG love of privatising stuff).

    edit: didn't see this
    Don't like change, view it as a stalking horse for further privatisation, pretending they care about their customers.

    Think they were opposed to Network Direct as well, but perhaps not as visibly, remember hearing of leaflets on buses.

    They just keep showing their ignorance of the merits of the scheme.

    Referring to it as the Walker scheme is just ignorant.


  • Registered Users Posts: 8,469 ✭✭✭dublinman1990


    The IT article also says the 84x route will be retained but it won't have that number once BusConnects gets implemented. They don't realize that it will be called the 301 going from either Kilcoole or Newcastle into Dublin City Centre. The article also has the choices report printed from last year which should be useless now because the new report for the actual network redesign has been already published on the BusConnects website.


  • Registered Users Posts: 11,470 ✭✭✭✭Ush1


    Trying to work out a journey on this proposed system. It would be from the current bus stop 4880 in Tallaght to the city centre.

    From what I can work out this will take 3 buses. 240, then A2 and then A. Is that correct?


  • Moderators, Motoring & Transport Moderators Posts: 11,655 Mod ✭✭✭✭devnull


    Ush1 wrote: »
    Trying to work out a journey on this proposed system. It would be from the current bus stop 4880 in Tallaght to the city centre.

    From what I can work out this will take 3 buses. 240, then A2 and then A. Is that correct?

    There is no such thing as an 'A' bus, what 'A' means is all buses that start with the A prefix so A2 would be one of those so if you need to get the 240 to connect with the A2, you would just get those two buses.


  • Moderators, Education Moderators Posts: 26,402 Mod ✭✭✭✭Peregrine


    Ush1 wrote: »
    Trying to work out a journey on this proposed system. It would be from the current bus stop 4880 in Tallaght to the city centre.

    From what I can work out this will take 3 buses. 240, then A2 and then A. Is that correct?

    No, there's no A route. You'd just get on the 240 and then the A2 into the city centre.

    There's also the 16 to the city centre (kind of like an extended 15b) from Whitestown/Kiltiper Way. It's every 10 minutes at peak times and every 20-26 minutes off peak. It's not as direct.

    Alternatively, you could get the S6, S7 or S8 from Old Bawn Road to The Square and get the Luas. Or walk to The Square and get the Luas.


  • Registered Users Posts: 1,638 ✭✭✭Qrt


    Peregrine wrote: »
    Or walk to The Square and get the Luas.

    That walkway is going to need some serious work done if that's going to be viable for anybody after sunset. It's one of those "you wouldn't let your daughter walk that way" pathways.


  • Registered Users Posts: 11,470 ✭✭✭✭Ush1


    Qrt wrote: »
    That walkway is going to need some serious work done if that's going to be viable for anybody after sunset. It's one of those "you wouldn't let your daughter walk that way" pathways.

    Are you talking about whitestown way? I normally walk through old bawn and then through Sean Walsh park to the square.


  • Registered Users Posts: 1,638 ✭✭✭Qrt


    Ush1 wrote: »
    Are you talking about whitestown way? I normally walk through old bawn and then through Sean Walsh park to the square.

    I'm on about the walkway between the Blue Bridge and Dún an Óir, between OBCS and Seán Walshe Park. Where the homeless fella was murdered a while back...


  • Registered Users Posts: 78,385 ✭✭✭✭Victor


    roadmaster wrote: »
    Independent.ie are saying residents could be getting €25k per square meter. Would they get that much?
    It might cost that (although I think that is a high number), but the property owner wouldn't get it all. There are other costs - legal, design, construction and in particular doing new boundaries.
    cgcsb wrote: »
    The proposal to ban cars on Prussia Street and Cabra road, except for local access, access to Prussia st shopping centre and the Lidl is interesting. Like how exactly would that be enforced?
    You could do a bus gate with rising bollards.
    CatInABox wrote: »
    I wonder how they're planning on building them. Working on all of them at the same time would be traffic suicide, so which ones should get priority?
    Priority would go on two main factors (a) legally, which one can proceed first and (b) which provides the best cost:benefit ratio - the benefit benefit being measure in reduced bus operation costs and less time wasted stuck in traffic.
    LXFlyer wrote: »
    cgcsb wrote: »
    It proposes radial journeys to Rathfarnham would be some of the fastest in Dublin, it's hard to imagine now but if the money is spent and the moaners ignored, there isn't any real reason why not.
    Really?

    It and the Templeogue QBC have the slowest bus speeds in the city.

    There is no way that such a change in peak journey times will ever be achieved on that route - it’s cloud cuckoo land.

    Short of razing the heart of Terenure, Rathgar and Rathmines villages to the ground it’s frankly impossible.
    I've sat on a bus at the traffic lights at Rathmines Town Hall for 6 minutes and not moved. Changing the lane arrangement and the traffic lights and adding enforcement would mean things like that wouldn't happen.

    At Rathmines Garda Station, you have similar problems that could be solved by turning on the bus gate here: https://www.google.ie/maps/@53.3203178,-6.2682842,3a,75y,19.63h,89.68t/data=!3m6!1e1!3m4!1s1_jVCj-NTGvtxn9YDmj-RA!2e0!7i13312!8i6656

    In Terenure and Rathgar, moving where general traffic queues for the junction could be used to improve the lot of buses.


  • Advertisement
  • Registered Users Posts: 17,715 ✭✭✭✭LXFlyer


    Some basic enforcement of the road traffic laws and existing bus priority measures would make a difference, and frankly that’s where I think the focus should be on. The lack of any enforcement is a serious problem.

    I still don’t see the journey time changes that the NTA are suggesting for the south central corridors ever happening Victor. The proposed CPO activity is going to be mired in actions in the courts, you can be sure of that.

    As for closing roads to general traffic outside of the city centre, I think that is going to be exceptionally difficult to push through as well.

    Frankly the proposed infrastructure changes in the south central area strike me as nothing more than tinkering around the edges, and I suspect won’t actually happen, and I remain unconvinced that anything short of a metro line for the area will make any real difference.


  • Registered Users Posts: 486 ✭✭Pixel Eater


    Is there any news on further public consultations locations? Neither the NTA or the Bus Connect website seems to have that info, well as far as I can see.


  • Registered Users Posts: 233 ✭✭Heartbreak Hank


    Is there any news on further public consultations locations? Neither the NTA or the Bus Connect website seems to have that info, well as far as I can see.


    https://www.busconnects.ie/media/1263/confirmed-information-session-locations-august-2018.pdf


    There are more in September too AFAIK.


  • Registered Users Posts: 78,385 ✭✭✭✭Victor


    To the ramparts comrades the NTA are coming for our houses!
    It mentions Monday 7 July. That's not this year.

    Full article here: http://www.localnews.ie/221%20North%20July%205%202018%20They%20want%20more%20than%20gardens.pdf The author Paul Kelly seems to hang out with Brid Smith of People Before Profit.
    Sorry just coming in on this thread now; what is the NBRU's gripe with the potential new system? Is it just the usual union intransigence or do they have some genuine concerns? I just checked their Twitter feed and it mostly consists of ad hominem attacks on Walker himself and can't really make out what their issue is??
    It seems that a lot of it is rabble rousing along various socialist principles.


  • Registered Users Posts: 5,606 ✭✭✭schemingbohemia


    The usual crew are using it as a "wedge" issue, something to rile up their constituents - see household waste, water charges, paying for anything, anything changing - and trying to show that they're the peoples champions.
    If they actually engaged with the process properly instead of getting the totally impartial NBRU in to their meetings they might get a better outcome for their constituents. But that isn't as useful to their project as organising a march in the city centre.


  • Registered Users Posts: 13,875 ✭✭✭✭Zebra3


    Victor wrote: »
    It mentions Monday 7 July. That's not this year.

    Full article here: http://www.localnews.ie/221%20North%20July%205%202018%20They%20want%20more%20than%20gardens.pdf The author Paul Kelly seems to hang out with Brid Smith of People Before Profit.

    It seems that a lot of it is rabble rousing along various socialist principles.

    What socialist issues? Bus Connects itself is a pro-socialist issue.


  • Registered Users Posts: 68,752 ✭✭✭✭L1011


    It reduces the number of bus drivers required to provide the same level of service. That is the reason the far left union is against it and their political followers have followed

    Not one driver will be laid off, the plan massively increases the number of buses and drivers required - just less than if they kept the current mess


  • Moderators, Motoring & Transport Moderators Posts: 11,655 Mod ✭✭✭✭devnull


    I suspect the fact that long standing staff members would be on pretty good shifts, with lots of overtime, less working anti-social hours and weekends and on the best routes and duties for many years and this could be lost if the network is redrawn, also plays a factor.

    Plus remember orbitals are pretty much Go-Ahead and radials are Dublin Bus - hence why they want to keep as many of the former as possible I presume.


  • Registered Users Posts: 78,385 ✭✭✭✭Victor


    devnull wrote: »
    Plus remember orbitals are pretty much Go-Ahead and radials are Dublin Bus
    I suspect the NTA will treat this as a general rule, not a strict demarcation.


  • Advertisement
  • Registered Users Posts: 13,875 ✭✭✭✭Zebra3


    L1011 wrote: »
    It reduces the number of bus drivers required to provide the same level of service. That is the reason the far left union is against it and their political followers have followed

    Not one driver will be laid off, the plan massively increases the number of buses and drivers required - just less than if they kept the current mess

    Far left? LOL.


Advertisement