Cost of laying wood floor and tiles

Options
  • 28-09-2018 8:12pm
    #1
    Registered Users Posts: 1,968 ✭✭✭


    Hi Guys,

    Myself and my wife are in the process of selling our home and purchasing a new house. Can anyone with experience tell me roughly how much I should budget for labour only (as I know there can be a major difference in the cost of the materials) to wood floor and tile the attached house. We’re planning on wood floor everywhere except for the bathrooms. For the bathrooms we’re planning tiles wall to ceiling. Even a very much ball park figure would be great.

    Thanks I’m advance


Comments

  • Registered Users Posts: 3,998 ✭✭✭3DataModem


    Hi Guys,

    Myself and my wife are in the process of selling our home and purchasing a new house. Can anyone with experience tell me roughly how much I should budget for labour only (as I know there can be a major difference in the cost of the materials) to wood floor and tile the attached house. We’re planning on wood floor everywhere except for the bathrooms. For the bathrooms we’re planning tiles wall to ceiling. Even a very much ball park figure would be great.

    Thanks I’m advance

    Budget 20 per square metre for labour, underlay, underfelt, trims, etc.


  • Registered Users Posts: 1,968 ✭✭✭blindside88


    3DataModem wrote: »
    Budget 20 per square metre for labour, underlay, underfelt, trims, etc.

    Thanks very much for that, gives me something to work with


  • Banned (with Prison Access) Posts: 390 ✭✭tradesman


    I say 25 - 30 for labour. Materials extra on tol


  • Registered Users Posts: 1,968 ✭✭✭blindside88


    tradesman wrote: »
    I say 25 - 30 for labour. Materials extra on tol

    Thanks for that, great to get differing opinions on it