Advertisement
If you have a new account but are having problems posting or verifying your account, please email us on hello@boards.ie for help. Thanks :)
Hello all! Please ensure that you are posting a new thread or question in the appropriate forum. The Feedback forum is overwhelmed with questions that are having to be moved elsewhere. If you need help to verify your account contact hello@boards.ie
Hi all! We have been experiencing an issue on site where threads have been missing the latest postings. The platform host Vanilla are working on this issue. A workaround that has been used by some is to navigate back from 1 to 10+ pages to re-sync the thread and this will then show the latest posts. Thanks, Mike.
Hi there,
There is an issue with role permissions that is being worked on at the moment.
If you are having trouble with access or permissions on regional forums please post here to get access: https://www.boards.ie/discussion/2058365403/you-do-not-have-permission-for-that#latest

pouring a concrete slab on existing concrete + hardcore-

  • 21-07-2020 12:10pm
    #1
    Registered Users Posts: 39


    I need a concrete slab for a new shed. I had an old slab but want to level it and extend it onto where some hardcore is. Anyone think of any issues with that? Would imagine it will only be 20mm higher than whats there currently.


Comments

  • Registered Users, Registered Users 2 Posts: 403 ✭✭hawkeye_bmr


    What type of shed are you talking, wooden/steel or block shed?

    I would say if you add 20mm to the top of the old slab, where the new one meets it will be a weak point and with settlement it will shear/crack along this.

    Any impacts or heavy point loaded weight will probably cause cracking on the 20mm side also.

    It will also be hard to get a good finish on the 20mm side as the aggregate will be very easily snagged when floating it.

    Is there an option to break-up the old slab and use it as hardcore?


  • Registered Users Posts: 39 Parkender


    What type of shed are you talking, wooden/steel or block shed?

    I would say if you add 20mm to the top of the old slab, where the new one meets it will be a weak point and with settlement it will shear/crack along this.

    Any impacts or heavy point loaded weight will probably cause cracking on the 20mm side also.

    It will also be hard to get a good finish on the 20mm side as the aggregate will be very easily snagged when floating it.

    Is there an option to break-up the old slab and use it as hardcore?

    Thanks for your reply. It’s a steel shed. Just going to be a storage unit so not overly fussed on finish etc. Just want it to do the bare necessities I suppose.


  • Registered Users, Registered Users 2 Posts: 403 ✭✭hawkeye_bmr


    Parkender wrote: »
    Thanks for your reply. It’s a steel shed. Just going to be a storage unit so not overly fussed on finish etc. Just want it to do the bare necessities I suppose.

    If you could get say 50mm onto of the existing slab it would be a lot easier to get a good finish and less chance of it cracking.

    Plus if you get plenty of hardcore compacted down there's less of it sinking/settling at the heavier section