Infrastructure that never happened

1235»

Comments

  • Moderators, Science, Health & Environment Moderators Posts: 19,940 Mod ✭✭✭✭Sam Russell


    Garret Fitzgerald was in favour of the Red line going underground. Pity he was not listened to because it would have been a much better solution.

    The complaint about the Red/Green 'interchange' is the missed opportunity to the allow the trams to be routed across the divide - Heuston to SSG and Sandyford, Sandyford to The Point, etc. A tram system should be a part of a network allows multiple routing.



  • Moderators, Sports Moderators Posts: 27,465 Mod ✭✭✭✭Podge_irl


    The complaint about the Red/Green 'interchange' is the missed opportunity to the allow the trams to be routed across the divide - Heuston to SSG and Sandyford, Sandyford to The Point, etc. A tram system should be a part of a network allows multiple routing.

    Why? Seems like needless complication and it's not standard practice anywhere I've been on trams anyway.



  • Registered Users, Registered Users 2 Posts: 7,748 ✭✭✭GerardKeating


    Interlining is very common on rail/train/tram networks, allows a much more flexibile network.

    They could have designed the network to allow a Sandyford to Hueston/Connolly service if they wanted.

    The origional plan for the Citywest extension had a junction design to allow a Citywest to Tallaght service, but that got dropped.



  • Registered Users, Registered Users 2 Posts: 7,663 ✭✭✭prunudo


    Not a recent proposal, but the original route for the trainline between Bray and Greystones was to go inland and to the west of Bray head but I believe it was local land owners who put an end to it and Brunnel was lumbered with far more difficult routing along the coast.

    It was due to go through the valley where Kilruddery, Belmont and Templecarrig are located. Can'thelp but wonder how the south eastern line would look today if didn't have centuries of issues due to erosion.



  • Registered Users Posts: 679 ✭✭✭Nibs05


    I seen Bremore port in north county Dublin mentioned here a few times, it’s still on the go.


    https://www.independent.ie/business/irish/new-plans-for-deep-water-port-at-bremore-co-dublin-to-be-unveiled/a939649046.html



  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 23,075 Mod ✭✭✭✭bk


    Such interlining usually comes with increased complexity and thus usually reduced frequency, speeds and capacity.

    That is why you rarely see it done in any of the busy high frequency, high capacity Metro or underground systems. Usually such systems make people interchange between lines.

    Given how busy and relatively high capacity the Luas is, it would be a bad idea here.



  • Moderators, Sports Moderators Posts: 27,465 Mod ✭✭✭✭Podge_irl


    I do not believe it is very common. This is entirely anecdotal, but I have literally never come across it on any transport network I have used (well, this is not true as I have used the NYC subway but didn't notice this. It's also not a good subway system). It goes against the very principle of having "lines" and instead seems just deeply confusing to passengers.

    The far better set-up is for fixed lines and interchange of passengers, which is the norm almost everywhere.



  • Moderators, Science, Health & Environment Moderators Posts: 19,940 Mod ✭✭✭✭Sam Russell


    Well, I would think 'lines' means a bit more than the Red and Green lines that barely touch, and miss quite a lot of highly used connections.

    If we had many shorter lines, then you might have a point but trams lines which have end to end times measured in hours hardly cut it as a viable system.

    Of course we have the buses.



  • Moderators, Science, Health & Environment Moderators Posts: 5,175 Mod ✭✭✭✭spacetweek


    If we had interlined Red and Green trams, only 1 in 3 trams would be useful to you when you arrived at your stop as all routes would have 3 termini. If your stop was before the split you'd be fine though.

    Not a fan of interlining, myself.



  • Advertisement
  • Registered Users Posts: 1,237 ✭✭✭gjim



    It's common on tram networks in my experience (Dublin doesn't really have a "network" - just two lines that intersect), much less so on metro systems. Recently I used trams (and buses) in Amsterdam and Zurich which both have dense tram networks and most stops seemed to offer you the choice of more than one route.



  • Moderators, Sports Moderators Posts: 27,465 Mod ✭✭✭✭Podge_irl


    So yes and no. It is indeed common to have multiple routes available at single stops, however what you don't generally get is interlining in the sense of trains going from e.g. The Point to Phibsboro let's say. If you want to get from the end of one tram line to the end of another you invariably have to change tram.



  • Registered Users Posts: 2,972 ✭✭✭mikemac2


    Ballina & Killaloe bridge between Tipperary and Clare (though Ballina likes to imagine they are in the more wealthy town of Killaloe, looking at you fake address Lakeside Hotel 🙄)

    So many years ago and maybe longer there was a plan for a new road bridge and the existing bridge would become a cyclist / pedestrian bridge. A super idea which should have happened 30 years ago but in 2023 we have no progress.

    Even local Minister Alan Kelly could not push this through.

    A bridge, hell get some students from Univerity of Limerick and it will be superb training for them and have someone experienced oversee it. One bridge is hardly the most difficult project ever

    When Ireland had no money and Minister Balfour was handing out money for uneconomical infrastructure there was a railway built between Birdhill and Killaloe. But in 2023 we cannot build a road bridge



  • Registered Users Posts: 1,237 ✭✭✭gjim


    Construction of this new bridge (about 1km south of the existing one) and bypass - https://www.clarecoco.ie/services/capital-projects/roads-and-bridges/killaloe-bypass-shannon-bridge-crossing/ - is well underway.



  • Registered Users Posts: 266 ✭✭Ronald Binge Redux


    And that would have increased capacity, how? Garret didn't want DART, he tried to scupper Luas. How he is thought of as 'rail enthusiast' in any way beats me. A more personable Sean Barrett.



  • Registered Users, Registered Users 2 Posts: 4,220 ✭✭✭goingnowhere


    Putting the Luas underground would have got us a German style Stadtbahn system (see Dusseldorf in particular for a city where this is really well done).

    Being able to whip along at 70kph underground with no junctions or pedestrians to dodge it would have cut a huge chunk of time off journeys and massively improved reliability



  • Advertisement
  • Moderators, Motoring & Transport Moderators, Technology & Internet Moderators Posts: 23,075 Mod ✭✭✭✭bk


    In fairness if they had cut and covered the Luas red line under abbey street, it would have solved a variety of problems with the line and other infrastructure.

    The maximum capacity of the red line is seriously constrained to the max 40meter long trams due to the distance between road junctions on Abbey Street.

    Had they made it a tunnel, they could easily have had 55m trams like the Green line or even longer Metro type vehicles.

    Also it would have avoided the issues with the junction at O’Connell St and have had a much faster journey time.

    You could then use Abbey Street as Reuther a cycling route or bus only route.

    It's common on tram networks in my experience (Dublin doesn't really have a "network" - just two lines that intersect), much less so on metro systems. Recently I used trams (and buses) in Amsterdam and Zurich which both have dense tram networks and most stops seemed to offer you the choice of more than one route.

    I know what you mean, I’ve been in plenty of cities like that, in particular all over Eastern Europe. The difference however is that in general they are using much smaller trams. Often the trams aren’t much larger than a bus, so it is more like a bus network with trams going here there and everywhere.

    The green line trams are some of the longest and highest capacity trams in the world. The green line is more approaching Metro like operation than these sort of tram networks.

    Even in those cities, when they start putting really long modern trams on, they tend to have far less interlining on those routes and run those as more like core fixed routes.

    Don’t get me wrong, I’d love for us to have an extensive tram network like these cities. Basically they have trams instead of buses. But I don’t think the interlining model is suitable for how our Luas system is designed.



  • Moderators, Science, Health & Environment Moderators Posts: 19,940 Mod ✭✭✭✭Sam Russell


    Not necessarily so.

    If the traffic warrants it, the trams would be distributed accordingly. So SSG to Heuston might be every 15 mins, while SSG to the point might be every half hour. All other trams to Parnell/Broadstone - for example. At busy mornings, Heuston to SSG might be more frequent that at say midday,

    The benefit of a network is it makes routine adjustments possible by reacting to traffic.



  • Moderators, Sports Moderators Posts: 27,465 Mod ✭✭✭✭Podge_irl


    Or just get people to change trams. Which is how most (almost all?) networks work in reality. It's easier for planning and frankly easier for the user.



  • Moderators, Sports Moderators Posts: 27,465 Mod ✭✭✭✭Podge_irl


    They also don't do interlining in the way being suggested. They also have end-to-end routes, they just share track for portions of the route. You invariably still need to change trams, you can just do so on the same platform.



  • Registered Users, Registered Users 2 Posts: 1,787 ✭✭✭KrisW1001


    The Munich U-Bahn has an interesting variation, in that it’s mostly three trunk lines with branches, but there are also a few strategic interlined segments that are very short - the sections where lines "cross" are usually only common for one or two stations before diverging again. Follow the path of U2 (dark red) on the map below to see what I mean.




  • Advertisement
  • Moderators, Science, Health & Environment Moderators Posts: 5,175 Mod ✭✭✭✭spacetweek


    Jesus, it would have taken you 10 seconds to look that one up!



  • Registered Users, Registered Users 2 Posts: 27,291 ✭✭✭✭breezy1985


    Much less time than typing that post 🤣

    The Granada "Metro" are buses that run 100% on bus lanes outside the city centre and then go underground for the central stops.