Pouring final floor before structure is built

  • 18-12-2023 11:41pm
    #1
    Registered Users, Registered Users 2 Posts: 336 ✭✭


    Looking to pour the final floor screed before walls, windows and roof is on.

    Currently at the stage where radon barrier is laid on top of subfloor. Thermal block is also laid.

    Looking to get a dry spell to lay the insulation boards, fix the ufh pipes and pour the top 60 or 70mm concrete floor.

    Has anyone done a house this way? In my mind the radon layer needs to be bone dry before the kingspan boards go on and the floor is poured. My thinking is that the moisture has no where to go otherwise.