  • Moderators, Entertainment Moderators, Science, Health & Environment Moderators Posts: 14,435 Mod ✭✭✭✭marno21


    Big chance this will be a Type 2 as well which will definitely fit under there



  • Registered Users, Registered Users 2 Posts: 69,249 ✭✭✭✭L1011


    That bridge design really looks like something that was copy/pasted between the two schemes. I think the design on Mullingar likely predates the NRA existing even though.



  • Registered Users, Registered Users 2 Posts: 1,683 ✭✭✭KrisW1001


    The most likely cross-section here is Type 2 DC (16.5 m paved). What’s there already is 13.5 m wide, so that only needs an extra 1.5 m on each side, which should be possible without disrupting the bridge.

    I don’t think Type 1 is very likely here. The short stretch of M4 around Mullingar might be relatively busy (22,000 AADT, still well within the capacity of the road type, though), but a lot of that volume looks to be due to local traffic - the rest of this corridor is only just above the capacity of a single carriageway (14.0 k at Edgworthstown, 13.5k at Longford, 8.0 k at Dromod).



  • Registered Users Posts: 3,805 ✭✭✭roadmaster


    Yip thats it, But i dont think the photo shows how low the arch is. If you put in 2+2 the outside lane for high vechicles will be very close to the belly of the bridge.

    In saying that it would be not to hard or pricey in the overall project costs to just build a new bridge a little further back as its only carrying a small local road over the N4.



  • Registered Users Posts: 3,805 ✭✭✭roadmaster


    Thats for sure. You had Consultants for different bridges then with different standards and it was Walls Civil that built it was so long ago



  • Advertisement
  • Registered Users, Registered Users 2 Posts: 1,683 ✭✭✭KrisW1001


    If it’s a problem, it’ll be far cheaper to lower the road level where goes under the bridge than to rebuild the bridge.



  • Registered Users, Registered Users 2 Posts: 4,598 ✭✭✭beggars_bush


    Not surprising for Dromod as the road splits in two after Longford